Sep. 30th, 2024

Update

Sep. 30th, 2024 06:44 am
johnridley: (Default)
The laundry room is in "operational" status - drywall and painting, flooring are done, machines and sink are operational. What is left to do is the cabinetry. We know what we want, I just need to do measurements and then put together a buy list and get to the store, pick up all the bits and assemble them.

Also, the air return from the 2nd floor needs to be finished. The sheet metal brake came in on Saturday. It's huge and I need to go and pick up a table for it to sit on. Again, I know exactly what I'm doing to do with it, I just need to get it done. Then the air return is about a day's work - some sheet metal work in the upstairs, and some cutting and metalwork in the basement.

I went to a funeral on Saturday. We're getting a lot of those lately but at least most of them are people in their 80s and 90s so not really tragic, just inevitable.

June 2025

S M T W T F S
1234567
891011121314
15161718192021
22232425262728
2930     

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 9th, 2025 04:46 am
Powered by Dreamwidth Studios