The laundry room is in "operational" status - drywall and painting, flooring are done, machines and sink are operational. What is left to do is the cabinetry. We know what we want, I just need to do measurements and then put together a buy list and get to the store, pick up all the bits and assemble them.

Also, the air return from the 2nd floor needs to be finished. The sheet metal brake came in on Saturday. It's huge and I need to go and pick up a table for it to sit on. Again, I know exactly what I'm doing to do with it, I just need to get it done. Then the air return is about a day's work - some sheet metal work in the upstairs, and some cutting and metalwork in the basement.

I went to a funeral on Saturday. We're getting a lot of those lately but at least most of them are people in their 80s and 90s so not really tragic, just inevitable.

September 2025

S M T W T F S
 123456
78910 111213
14151617181920
2122232425 2627
282930    

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 30th, 2025 02:45 am
Powered by Dreamwidth Studios