Shop progress 9/9/2018
Sep. 9th, 2018 06:55 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Nearly all the insulation is up (odd spaces around the garage door not done). Most of the plywood is up.
Wiring put in place for the mini split heat pump that is ordered for the southwest corner. Lots of expanding foam was shot into the corners.
I'm going to have to get some strips, I think maybe 1x2 or something, to caulk and tack into all the corners to stop drafts. There was a lot of breeze blowing in through the cracks today when it got windy.
I am going to have to remove the garage door, at least slightly, to slip plywood wall board between the studs and the garage door mount to seal that area. That'll likely take an entire evening, if I'm lucky.
Now I really need to decide on a layout so that I can start building storage. This is going to be the tricky part of this whole thing.

Wiring put in place for the mini split heat pump that is ordered for the southwest corner. Lots of expanding foam was shot into the corners.
I'm going to have to get some strips, I think maybe 1x2 or something, to caulk and tack into all the corners to stop drafts. There was a lot of breeze blowing in through the cracks today when it got windy.
I am going to have to remove the garage door, at least slightly, to slip plywood wall board between the studs and the garage door mount to seal that area. That'll likely take an entire evening, if I'm lucky.
Now I really need to decide on a layout so that I can start building storage. This is going to be the tricky part of this whole thing.