Jun. 24th, 2007

johnridley: (Gromit)
More than half done I'd say. The frame is complete, except I was short a 2x6. The throwing arm is done, other than trimming the release end.
Still to do:
Buy/make U bolts to hold the axle onto the top beam.
Cut the center out of the main beam (leaving just the axle)
Build the weight box
Figure out position of winch and pulleys and mount them.
Build the release mechanism, and mount hooks for safety restraint ropes
Get some rope and make the sling (this may wait until we're on site).
Get some more bowling balls.

It occurs to me that after firing, the top of the arm is going to be 16 feet off the ground, and we'll have to get a cable on it to pull it down. L says just use a long stick to loop the cable over the end. That will probably work fine; a 12 foot stick in someone's hand should be tall enough.

I've received word that the local bowling alley has literally "a barn full" of old bowling balls, and we can probably get as many as we want.

September 2025

S M T W T F S
 123456
78910 111213
14151617181920
2122232425 2627
282930    

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Sep. 27th, 2025 03:13 pm
Powered by Dreamwidth Studios